2016
DOI: 10.1016/j.biombioe.2016.10.002
|View full text |Cite
|
Sign up to set email alerts
|

Simulation of air-steam gasification of woody biomass in a bubbling fluidized bed using Aspen Plus: A comprehensive model including pyrolysis, hydrodynamics and tar production

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
37
0

Year Published

2017
2017
2020
2020

Publication Types

Select...
6

Relationship

1
5

Authors

Journals

citations
Cited by 77 publications
(43 citation statements)
references
References 23 publications
0
37
0
Order By: Relevance
“…The results showed that 61 MW of hydrogen can be produced from 100 MW of woodchips, and 6 MW of power generation can be achieved. The important factors for the estimation of hydrogen production cost were the price of the biomass material, investment cost for the plant, [98] and the plant operation time per year. The hydrogen production cost of 54 € MWh -1 was achieved in this case study.…”
Section: Process Flowsheet Simulation For Hydrogen Production Via Biomentioning
confidence: 99%
“…The results showed that 61 MW of hydrogen can be produced from 100 MW of woodchips, and 6 MW of power generation can be achieved. The important factors for the estimation of hydrogen production cost were the price of the biomass material, investment cost for the plant, [98] and the plant operation time per year. The hydrogen production cost of 54 € MWh -1 was achieved in this case study.…”
Section: Process Flowsheet Simulation For Hydrogen Production Via Biomentioning
confidence: 99%
“…Gasification process is simulated using combined steamair as gasifying agent with all reactions and the kinetics data are taken from study of Pauls et al 21 For PEM electrolyzer is assumed with performances of 57%-64% LHV or 58-52 kWh of electricity per kg of H 2 . 22 By using electricity consumption data from the PV electrolysis process, the capacities of photovoltaic-based power plant and the battery necessary can be obtained.…”
Section: Simulation Of Production Green Ureamentioning
confidence: 99%
“…However, in known designs of gas generating units with a continuous bed, combustible gas produced from plant raw materials has calorific value not more than 10 MJ/Nm 3 [15,16]. Unlike this type of gas generators, modern gas generators with a fluidized bed have efficiency factor up to 80 % and calorific value of combustible gas reaches 18.5 MJ/Nm 3 [9]. However, they have an elaborate design requiring significant energy consumption in operation and maintenance.…”
Section: Literature Review and Problem Statementmentioning
confidence: 99%
“…[7,8]. Technological improvements should provide use of steam-oxygen blast at normal and high pressures [9] or oxygen-enriched air blast [10]. There are methods for improving efficiency of the gasification process by providing high temperatures in the active zone of the gas generator [11] and expansion of reacting surface area of fuels [12].…”
Section: Introductionmentioning
confidence: 99%