2022
DOI: 10.1016/j.seta.2022.102338
|View full text |Cite
|
Sign up to set email alerts
|

Simulation and optimization of electricity generation by waste to energy unit in Tehran

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
10
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 16 publications
(10 citation statements)
references
References 35 publications
0
10
0
Order By: Relevance
“…This method, which is the oldest sizing method, as its name suggests, gives the desired size approximately [ 9 ]. Due to their simple, reliable design, active boost converters have been widely used to improve power factors.…”
Section: Types Of Sizing Methodsmentioning
confidence: 99%
“…This method, which is the oldest sizing method, as its name suggests, gives the desired size approximately [ 9 ]. Due to their simple, reliable design, active boost converters have been widely used to improve power factors.…”
Section: Types Of Sizing Methodsmentioning
confidence: 99%
“…According to the standards, the access time of emergency and medical centers in residential areas in the city should be between 4-7 minutes. Emergencies (medical centers) play a significant role in what happens after a crisis occurs when the centralization of hospitals causes limitations in providing medical services to areas far from these centers [38]. The status of the study area in terms of the accessibility of medical centers (hospitals) for the regions of the 10th district of Tehran is shown in Figure 8.…”
Section: Emergency Service Performance Levelmentioning
confidence: 99%
“…With the increase in population in big cities, the public services demand has increased [1]. Also, with more usage of cars, the need to create multiple fuel stations has increased.…”
Section: Introductionmentioning
confidence: 99%