2022
DOI: 10.21776/jrm.v13i2.838
|View full text |Cite
|
Sign up to set email alerts
|

Simulasi Perubahan Beban Pembangkit Listrik Tenaga Uap: Studi Kasus Di Gorontalo Utara

Abstract: Conceptual and design studies on 25 MW Northen Gorontalo steam based power plant are carried out under the existing comissioning data at four different load. The urgency of this study is related with supporting the prevention of greenhouse gass  emission and completing indonesian power plant energy map. This observation conducted by simulating those condition in Gatecycle  software and analyzing the output parameter to determine the power plant performance specifically heat rate, heat transfer duty, efficiency… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 32 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?