2017
DOI: 10.1109/tia.2017.2650984
|View full text |Cite
|
Sign up to set email alerts
|

Simplified Frequency Estimation for Unit Scheduling Criteria for Grids With High Wind Penetration

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
3
2

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
(2 citation statements)
references
References 9 publications
0
2
0
Order By: Relevance
“…In [9], with the knowledge of different loads and wind conditions, a new unit scheduling criteria is proposed to integrate the system equivalent speed droop along with the M factor. Also, in [9] the system reliability is considered, specifying the maximum allowable power loss and the required size of the operating reserve.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…In [9], with the knowledge of different loads and wind conditions, a new unit scheduling criteria is proposed to integrate the system equivalent speed droop along with the M factor. Also, in [9] the system reliability is considered, specifying the maximum allowable power loss and the required size of the operating reserve.…”
Section: Introductionmentioning
confidence: 99%
“…Also, in [9] the system reliability is considered, specifying the maximum allowable power loss and the required size of the operating reserve.…”
Section: Introductionmentioning
confidence: 99%