2016
DOI: 10.3844/ajgsp.2016.36.46
|View full text |Cite
|
Sign up to set email alerts
|

Short Period Spectral Acceleration Zonation of Tehran a Comparison between Slip and Activity Rates Data’s

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
7
0

Year Published

2016
2016
2020
2020

Publication Types

Select...
5

Relationship

3
2

Authors

Journals

citations
Cited by 6 publications
(7 citation statements)
references
References 33 publications
0
7
0
Order By: Relevance
“…Agliardi and Crosta (2003;Lan et al, 2007;Lan, 2011;Topal et al, 2007;Frattini et al, 2012a;2012b;Valagussa et al, 2014;Margottini et al, 2016), recent studies have led to know the modern methods of 3D zoning rockfall hazard, especially for communication networks (Budetta, 2004). The recent earthquakes, according to Firuzkuh fault movements (Jarahi et al, 2016), has led to increasing rockfalls in the study area. In this study, we use Lan et al (2007) method and RA software aims to study the rockfall hazard zonation in this part of Haraz highway.…”
Section: Introductionmentioning
confidence: 99%
“…Agliardi and Crosta (2003;Lan et al, 2007;Lan, 2011;Topal et al, 2007;Frattini et al, 2012a;2012b;Valagussa et al, 2014;Margottini et al, 2016), recent studies have led to know the modern methods of 3D zoning rockfall hazard, especially for communication networks (Budetta, 2004). The recent earthquakes, according to Firuzkuh fault movements (Jarahi et al, 2016), has led to increasing rockfalls in the study area. In this study, we use Lan et al (2007) method and RA software aims to study the rockfall hazard zonation in this part of Haraz highway.…”
Section: Introductionmentioning
confidence: 99%
“…Figure 1 shows potential seismic sources in Karaj region. Further the meizoseismal area of historical events and paleoshoreline trace (Jarahi et al, 2016) are shown. A total of 6 line sources and their corresponding Mmax are chosen.…”
Section: Probabilistic Seismic Hazard Analysismentioning
confidence: 99%
“…2. The logic tree for weighting seismic parameters (Jarahi et al, 2016) Generally, in seismic hazard analysis, annual rate of earthquakes in active faults is calculated by definite integration on magnitude-frequency relation.…”
Section: Probabilistic Seismic Hazard Analysismentioning
confidence: 99%
“…Calculating spectral acceleration (Jarahi, 2011;Jarahi et al, 2015;Jarahi et al, 2016;Jarahi, 2016;Haerifard et al, 2018;Pourmohamad, 2006;Baker and Cornell, 2006a) is one of the most important steps in seismic designing for infrastructures like concrete dams. UHS is calculated for a period of 0 to 4 sec by probabilistic method with the unified weight (Bommer et al, 2008) to each spectral attenuation equations (Abrahamson and Silva, 1997;Campbell and Bozorgnia, 2003;Ambraseys et al, 2005) by using EZ-Frisk software Fig.…”
Section: Uniform Hazard Spectra (Uhs)mentioning
confidence: 99%
“…Hence, selecting these parameters is a logical selection for simulating earthquakes. Controlling magnitude is a midpoint of a range of earthquake magnitudes that may control the design (Jarahi, 2011;Jarahi et al, 2016;Jarahi, 2016). Considering SHD, the controlling earthquakes is evaluated for return periods of 475 and 2475years with the PGA and periods of 0.2, 0.5, 2 and 4 sec (Table 4 and Fig.…”
Section: Seismic Hazard Deaggregation (Shd)mentioning
confidence: 99%