2009
DOI: 10.1080/00207540802609665
|View full text |Cite
|
Sign up to set email alerts
|

Shipyard production cost structure optimisation model related to product type

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2015
2015
2021
2021

Publication Types

Select...
7

Relationship

1
6

Authors

Journals

citations
Cited by 8 publications
(2 citation statements)
references
References 17 publications
0
2
0
Order By: Relevance
“…They all tried to improve the shipbuilding efficiency by enhancing the ability of resources. The cost (man hour) control models developed by Niksa Fafandjel et al (2010) and Emblemsvag (2014) etc. created studies that contributed to the work of Hassan & Kajiwara (2013); and studies on the running distance optimization of the crane were done by Roh & Lee (2010) etc.…”
Section: Literature Reviewmentioning
confidence: 99%
“…They all tried to improve the shipbuilding efficiency by enhancing the ability of resources. The cost (man hour) control models developed by Niksa Fafandjel et al (2010) and Emblemsvag (2014) etc. created studies that contributed to the work of Hassan & Kajiwara (2013); and studies on the running distance optimization of the crane were done by Roh & Lee (2010) etc.…”
Section: Literature Reviewmentioning
confidence: 99%
“…In this paper, the market analysis was focused on different sailing boat ballast keel configurations. In order for a successful market analysis to be obtained, the equipment design parameters should be reviewed, [6].…”
Section: Fig 1 the Suggested Process Flow Chartmentioning
confidence: 99%