Setup time reduction using single minute exchange of dies (SMED) at a forging line

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 4 publications
0
2
0
Order By: Relevance
“…Implementation of Lean Principle such as SMED by converting internal activity into external activity as well as using pneumatic power tools and other tools at forging line helps setup time reduced by 40%. The previous setup time was 90 minutes is reduced to 54 minutes (Talekar et al 2019).…”
Section: Environmentmentioning
confidence: 99%
“…Implementation of Lean Principle such as SMED by converting internal activity into external activity as well as using pneumatic power tools and other tools at forging line helps setup time reduced by 40%. The previous setup time was 90 minutes is reduced to 54 minutes (Talekar et al 2019).…”
Section: Environmentmentioning
confidence: 99%
“…The concept used in time-related lean production is just in time and SMED (Single Minute Exchange Dies) is associated with model change. In various industries, such as the iron industry, the apparel industry, and the telecommunications panel industry (Gavali, Chavan and Dongre, 2016;Mulyana and Hasibuan, 2017;Singla and Pal, 2017;Zerin, Hossain and Zannat, 2019), SMED is widely used to solve rapid transition problems in the production process (Esa, Rahman and Jamaludin, 2015;Jagtap et al, 2015;Filla, 2016;Gavali, Chavan and Dongre, 2016;Arief and Ikatrinasari, 2018;Syafei and Lokadipati, 2018;Agung and Hasbullah, 2019;Talekar et al, 2019). The application of SMED in the clothing industry had been a success in reducing the replacement time of the model between 0.45-12.6 hours (Singla and Pal, 2017), while the replacement time in the apparel industry had reduced by 283.81 minutes (Zerin, Hossain and Zannat, 2019), It can reduce the retooling time by up to 6 minutes in the food industry (Maalouf and Zaduminska, 2019), it can saved setup time by up to 12 minutes in the pharmaceutical industry (Arief and Ikatrinasari, 2018), it can reduce setup time by up to 9 minutes in the copper cable industry (Setyawan, 2019).…”
Section: Literature Reviewmentioning
confidence: 99%