2008
DOI: 10.1016/j.engstruct.2008.03.019
|View full text |Cite
|
Sign up to set email alerts
|

Settlement analysis of the Mornos earth dam (Greece): Evidence from numerical modeling and geodetic monitoring

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

2
45
0

Year Published

2011
2011
2022
2022

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 76 publications
(47 citation statements)
references
References 13 publications
2
45
0
Order By: Relevance
“…Until recently, many studies were conducted concerning monitoring structural responses of dams, specifically, earth dams (Guler et al 2006;Bayrak 2008;Gikas & Sakellariou 2008a;Ehiorobo & Ehigiator 2011;Kalkan 2014) and concrete dams (Pytharouli & Stiros 2005;Sortis & Paoliani 2007) on the bases of geodetic and geotechnical methods. Guler et al (2006) evaluated the surface movements of Alibey Earth Dam (Istanbul) by means of geodetic and geotechnical methods.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Until recently, many studies were conducted concerning monitoring structural responses of dams, specifically, earth dams (Guler et al 2006;Bayrak 2008;Gikas & Sakellariou 2008a;Ehiorobo & Ehigiator 2011;Kalkan 2014) and concrete dams (Pytharouli & Stiros 2005;Sortis & Paoliani 2007) on the bases of geodetic and geotechnical methods. Guler et al (2006) evaluated the surface movements of Alibey Earth Dam (Istanbul) by means of geodetic and geotechnical methods.…”
Section: Introductionmentioning
confidence: 99%
“…The results showed that the reservoir water level changes are an important triggering factor for the Yamula Dam deformations. Gikas and Sakellariou (2008a) investigated the long-term settlement behaviour of the Mornos Earth Dam in Greece. Precise levelling data were used for monitoring measured deformations and the results obtained were compared with those from a numerical back analysis model.…”
Section: Introductionmentioning
confidence: 99%
“…Despite the compaction efforts, internal displacements may still be significant during impounding of the reservoir and generally diminish with time but time-dependent creep may continue at a slow rate for several years (Clements 1984;Gikas and Sakellario 2008;Kim and Kim 2008). The time-dependent behavior of CFRD is largely dependant on the construction technique, construction time, valley shape and construction material type, and the analysis of such behavior requires continuous monitoring of displacements and stresses in the body of dam and its foundation.…”
Section: Introductionmentioning
confidence: 98%
“…In most studies, one or several dams have been considered specifically to determine the influential parameters in predicting dam settlement (Park et al, 2005;Malla et al, 2007;Gikas and Sakellariou, 2008;Seo et al, 2009;Zhou et al, 2011). Based on these studies, it is noted that the dam height is the main factor in crest settlement (Kim and Kim, 2008).…”
Section: Introductionmentioning
confidence: 99%