Sequential Measurement and Analysis of Large Underground Retaining Structures by Diaphragm Wall Anchor for the Spring Area

Abstract: The performance of a diaphragm wall-anchor structure in spring area in Jinan city, China, is studied. Based on field measured data, lateral wall deflections, lateral soil movements, horizontal displacement of the capping beam, the maximum lateral wall deflection, ground surface settlement, lateral earth pressures on diaphragm wall, internal force of diaphragm wall, axial anchoring forces, settlements of adjacent building, and pore-water pressure are investigated. The results indicate that the maximum deflectio… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 37 publications
(72 reference statements)
0
0
0
Order By: Relevance
“…In order to give stability to the cut, anchored diaphragm wall panels oriented towards the slope were used. This is an unusual solution, because underground walls are primarily used as a securing and sealing element in deep excavations and foundations of buildings either for temporary excavation support or as part of the permanent structure [4][5][6][7]. Currently, the construction of individual diaphragm wall panels is being carried out on the construction site, and the upper part of the wall is being dug out for the purpose of its multi-level anchoring.…”
Section: Introductionmentioning
confidence: 99%
“…In order to give stability to the cut, anchored diaphragm wall panels oriented towards the slope were used. This is an unusual solution, because underground walls are primarily used as a securing and sealing element in deep excavations and foundations of buildings either for temporary excavation support or as part of the permanent structure [4][5][6][7]. Currently, the construction of individual diaphragm wall panels is being carried out on the construction site, and the upper part of the wall is being dug out for the purpose of its multi-level anchoring.…”
Section: Introductionmentioning
confidence: 99%