Sequencing Research and the Industrial Scheduling Problem

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
32
0
2

Year Published

1973
1973
2015
2015

Publication Types

Select...
4
3
2

Relationship

0
9

Authors

Journals

citations
Cited by 106 publications
(37 citation statements)
references
References 0 publications
0
32
0
2
Order By: Relevance
“…En effet, dans leurs études, Panwalkar et al [1973] ont rapporté que 70 % des activités industrielles subissaient des temps de réglages dépendants et que, dans 13 % des cas, toutes les activités en subissaient. Cette situation est similaire à celle observée ces dernières années.…”
Section: Et La Technologie Deunclassified
See 1 more Smart Citation
“…En effet, dans leurs études, Panwalkar et al [1973] ont rapporté que 70 % des activités industrielles subissaient des temps de réglages dépendants et que, dans 13 % des cas, toutes les activités en subissaient. Cette situation est similaire à celle observée ces dernières années.…”
Section: Et La Technologie Deunclassified
“…Pour plus d'informations sur la théorie de la complexité, le lecteur consultera Cook [1971] et Garey et Johnson [1979]. Le but de la théorie de la complexité est la classification des problèmes de décision [Cook, 1971] [Panwalkar et al, 1973;Allahverdi et al, 1999;Zhu et Wilhelm, 2006;Allahverdi et al, 2008].…”
Section: Complexité Des Problèmes D'ordonnancementunclassified
“…Wilbrecht and Prescott (1969) found that sequence-dependent setup times were significant when a job shop was operated at or near full capacity. In a survey of industrial managers, Panwalkar et al, (1973) discovered that out of about three-quarters of the managers' reports, at least some of their scheduled operations require sequence-dependent setup times, while approximately 15% reported all operations requiring sequence-dependent setup times. Flynn (1986) determined that applications of both sequence-dependent setup procedures and group technology principles increased output capacity in a cellular manufacturing shop.…”
Section: Literature Reviewmentioning
confidence: 99%
“…The first and second criteria are related to the measures of makespan and flowtime, respectively, while the third one is related, for example, to the maximum tardiness, or total tardiness. The early survey of industrial managers in (Panwalkar, Dudek, and Smith, 1973) showed that meeting due dates was the most important criterion, and today it is even more important in a much higher competitive market.…”
Section: Introductionmentioning
confidence: 99%