1993
DOI: 10.1080/00207549308956816
|View full text |Cite
|
Sign up to set email alerts
|

Sequencing, dispatching and switching in a dynamic manufacturing environment

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
24
0
1

Year Published

1998
1998
2016
2016

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 50 publications
(25 citation statements)
references
References 5 publications
0
24
0
1
Order By: Relevance
“…Moreover, the distribution of operation processing times has been recognized as an important area, within the manufacturing planning and control system, where the variance can be more easily created (Melnyk et al 1992, Matsuura et al 1993.…”
Section: Processing Time Variabilitymentioning
confidence: 99%
“…Moreover, the distribution of operation processing times has been recognized as an important area, within the manufacturing planning and control system, where the variance can be more easily created (Melnyk et al 1992, Matsuura et al 1993.…”
Section: Processing Time Variabilitymentioning
confidence: 99%
“…(ii) From a methodological point of view, the simulation model can be improved through a deeper insight in the analytic relationships that link the parameters upon which the system's running primarily depends. (iii) While this research addressed the batch problem in a deterministic way, uncertainty frequently causes disturbances in production control, sometimes resulting in rescheduling at short intervals [33]. For this reason, the dynamic events that may occur in real-life shop oors and which upset production activities (i.e.…”
Section: Concluding Remarks and Future Research Pathsmentioning
confidence: 99%
“…Matsuura et al [5] stated that they are the events of errors in estimated processing time, machine breakdowns, specification changes, errors in routing data, which specify machines that a job will visit, cancellation of orders, and rush orders, which apparently varied. Errors in estimated processing times would bring the same effect as machine breakdowns with short time intervals.…”
Section: Dynamic Manufacturing Environmentmentioning
confidence: 99%