DOI: 10.11606/d.3.2014.tde-29122014-182321
|View full text |Cite
|
Sign up to set email alerts
|

Sequenciamento e programação de lavra com alocação de equipamentos de carga.

Abstract: This paper focuses on the mining scheduling problem in open pit, considering the allocation of loading equipment. This study considers the existence of a heterogeneous fleet loading equipment and two types of mineable material, namely ore or waste. For the mining of ore are considered quality requirements to be met by the ore blending, a crusher, the capacity of operation of the processing plant and a stockpile which feed the plant when there is lack of ore in mining fronts, called ROM stockpile. In a mine, lo… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 6 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?