2022 Winter Simulation Conference (WSC) 2022
DOI: 10.1109/wsc57314.2022.10015255
|View full text |Cite
|
Sign up to set email alerts
|

Sequence Scrambling in Aggregated Mixed-Model Production Line Modeling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
0
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 18 publications
0
0
0
Order By: Relevance
“…In addition to the application results, the solution space management approach also needs to be validated as a part of the data-farming-based planning approach by Kroeger et al [46], which will be the subject of future publications.…”
Section: Discussionmentioning
confidence: 99%
See 1 more Smart Citation
“…In addition to the application results, the solution space management approach also needs to be validated as a part of the data-farming-based planning approach by Kroeger et al [46], which will be the subject of future publications.…”
Section: Discussionmentioning
confidence: 99%
“…In strategic network design, many production line characteristics are uncertain. Therefore, production line failures can be estimated based on similar existing production lines using aggregated line models, as presented in [46,47]. For this industrial application, only the production line behavior of the rotor lines is varied between a worst-case and a realistic case (SC04).…”
Section: Application Of Step 2: Solution Space Planning and Controlmentioning
confidence: 99%