2008
DOI: 10.1504/ijise.2008.017422
|View full text |Cite
|
Sign up to set email alerts
|

Sensitivity analysis of a preventive maintenance scheduling model

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
0
0

Year Published

2010
2010
2023
2023

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(2 citation statements)
references
References 17 publications
0
0
0
Order By: Relevance
“…Figure 2 describes the three causes of breakdown. Source: The breakdown of equipment contributes to cost of production and affects the overall equipment efficiency significantly in production lines that are automated due to downtime unplanned (Oke et al 2020). This problem takes place through failure in machine along the lines of manufacturing and cause to loss in time of production thus reducing plant productivity (Ab-Samat et al 2012).…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Figure 2 describes the three causes of breakdown. Source: The breakdown of equipment contributes to cost of production and affects the overall equipment efficiency significantly in production lines that are automated due to downtime unplanned (Oke et al 2020). This problem takes place through failure in machine along the lines of manufacturing and cause to loss in time of production thus reducing plant productivity (Ab-Samat et al 2012).…”
Section: Introductionmentioning
confidence: 99%
“…A production system's downtime and reliability can be investigated through use of pareto chart, Weibull, and reliability/failure time analysis. The pareto chart further analysis the factors that contributes to approximately eighty per-cent downtime (Oke et al 2021), while Weibull are models used for description of various observed failures of systems and phenomena (Raju et al 2018).…”
Section: Introductionmentioning
confidence: 99%