PsycTESTS Dataset 2005
DOI: 10.1037/t50936-000
|View full text |Cite
|
Sign up to set email alerts
|

Self Description Questionnaire II--Short Form

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
35
0
13

Year Published

2005
2005
2023
2023

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 25 publications
(50 citation statements)
references
References 0 publications
0
35
0
13
Order By: Relevance
“…Previously reported reliability measures for each scale are high (a = 0.88 -0.94). Scores on science self-concept and academic achievement show good correlation (r = .70) (Marsh, 1992). Scores of science self-concept were based on total ratings.…”
Section: High Cohesion Text Low Cohesion Textmentioning
confidence: 99%
“…Previously reported reliability measures for each scale are high (a = 0.88 -0.94). Scores on science self-concept and academic achievement show good correlation (r = .70) (Marsh, 1992). Scores of science self-concept were based on total ratings.…”
Section: High Cohesion Text Low Cohesion Textmentioning
confidence: 99%
“…des anderen Geschlechts, soziale Beziehungen zu den Eltern (Beispielitem: "Mit meinen Eltern verstehe ich mich gut. ", Brettschneider & Klimek, 1998;Marsh, 1990). Für den vorliegenden Beitrag wurden die Dimensionen zum generellen Selbstkonzept und zur emotionalen Stabilität nicht ausgewertet.…”
Section: Instrumenteunclassified
“…However, given the multidimensionality (Byrne & Shavelson, 1996;Marsh, 1990) of the construct, using general measures for self-concept, which encompass different sides, won't be the most adequate way to investigate the self-perception of the subject at work. Attending specifically to the professional selfconcept, it is conceptualized as a conscious, evolving, self-descriptive and evaluative construct (Ireson & Hallam, 2008;Nogueira, 2002;Pinto, 2003;Veiga, 2012), which allows the self-evaluation of the subject in context of work (Souza & Puente-Palacios, 2011).…”
Section: Responsibility Of the Conference Organization Committeementioning
confidence: 99%