Selection of risk response actions with consideration of secondary risks

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
20
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 36 publications
(20 citation statements)
references
References 40 publications
0
20
0
Order By: Relevance
“…According to Figure 1, after obtaining all journal articles through keyword search, the second-round refinement of the literature was performed to remove articles that did not fall into the project management field. Project management, as defined by multiple studies [37][38][39][40], generally involves the monitoring and control of project performance in terms of cost, time, quality, and risks. Following the second-round refinement, a third-round checking was performed to further remove articles which did not focus on PPP-related research themes.…”
Section: Bibliometric Analysis Abstractearch Was Performed Inmentioning
confidence: 99%
“…According to Figure 1, after obtaining all journal articles through keyword search, the second-round refinement of the literature was performed to remove articles that did not fall into the project management field. Project management, as defined by multiple studies [37][38][39][40], generally involves the monitoring and control of project performance in terms of cost, time, quality, and risks. Following the second-round refinement, a third-round checking was performed to further remove articles which did not focus on PPP-related research themes.…”
Section: Bibliometric Analysis Abstractearch Was Performed Inmentioning
confidence: 99%
“…Equation (4) was used to get the total relation matrix, where I was the identity matrix. The row sum and column sum from matrix T were shown in Equations (5) and (6).…”
Section: Choosing Evaluation Indexes Using Dematelmentioning
confidence: 99%
“…Step 5: Calculation of center degree and cause degree. Using Equations (5) and (6) to get row sum and column sum, (r i + f j ) and (r i − f j ) were shown in Table 7. The influence of elements was relatively large, and no index needed to be discarded.…”
Section: Costs (B)mentioning
confidence: 99%
See 1 more Smart Citation
“…Risk response used the collective information in the analysis stage and in order to take decision how to improve the possibility to complete the project within time, cost and performance. Project managers should allocate more budgets for responding the project risk when the secondary risk is considered, and consider all factors relating to both time and cost so as to select appropriate RRAs to mitigate primary risk and secondary risk [2]. Risks affect integrated risk management paper found risks concerning employees, performance, responsibilities, agreements and timing [3].…”
Section: Introductionmentioning
confidence: 99%