2013
DOI: 10.3141/2330-06
|View full text |Cite
|
Sign up to set email alerts
|

Selection of Dredging Projects for Maximizing Waterway System Performance

Abstract: Budget allocation to annual maintenance dredging projects conducted by the U.S. Army Corps of Engineers is addressed. Of the many projects requested, only a subset may be selected for funding because of budgetary constraints. The benefits of conducting maintenance dredging at one dredging project depend on other projects in the system that also are being dredged to take advantage of transportation efficiency gains derived from deeper navigable waterways. The proposed integer programming models and heuristic so… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
8
0

Year Published

2016
2016
2024
2024

Publication Types

Select...
7

Relationship

1
6

Authors

Journals

citations
Cited by 15 publications
(8 citation statements)
references
References 12 publications
0
8
0
Order By: Relevance
“…Annualized sediment accumulation rates and dredging operation costs are considered in the Corps Shoaling Analysis Tool (CSAT), which is part of the optimization model . The connectivity of projects is considered to prevent unnecessary dredging in situations where connected projects have differing limiting depths (Mitchell et al 2013;Loney et al 2020). The sophisticated optimization model has brought mathematical rigor to the formerly ad hoc prioritization scheme.…”
Section: Introductionmentioning
confidence: 99%
“…Annualized sediment accumulation rates and dredging operation costs are considered in the Corps Shoaling Analysis Tool (CSAT), which is part of the optimization model . The connectivity of projects is considered to prevent unnecessary dredging in situations where connected projects have differing limiting depths (Mitchell et al 2013;Loney et al 2020). The sophisticated optimization model has brought mathematical rigor to the formerly ad hoc prioritization scheme.…”
Section: Introductionmentioning
confidence: 99%
“…Efficient design, operation, and maintenance of this navigation infrastructure is vital to the nation's economy and security. In managing its portfolio, the USACE spends more than $2 billion annually to investigate, construct, and maintain projects (1,2). Of that expenditure, approximately $1 billion is spent annually on maintenance dredging to remove sediment that reduces the depth of maintained channels (3,1).…”
mentioning
confidence: 99%
“…In managing its portfolio, the USACE spends more than $2 billion annually to investigate, construct, and maintain projects (1,2). Of that expenditure, approximately $1 billion is spent annually on maintenance dredging to remove sediment that reduces the depth of maintained channels (3,1). Despite this investment in channel maintenance, dredging requirements have continu-ally outpaced available maintenance funding.…”
mentioning
confidence: 99%
See 2 more Smart Citations