Selection of Construction Project Taking into Account Technological and Organizational Risk

Abstract: During the implementation of construction projects, there is permanently a certain level of technological and organizational risk. This is due to the fact that the data on conditions for a construction project tend to have different levels of uncertainty. Even the projects of the same size and terms of implementation vary. The failure risk of individual works results from technological and organizational factors, such as, for example, the difficulty of technological execution of individual works; availability … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
10
0

Year Published

2018
2018
2020
2020

Publication Types

Select...
8

Relationship

3
5

Authors

Journals

citations
Cited by 13 publications
(10 citation statements)
references
References 10 publications
0
10
0
Order By: Relevance
“…It is not recommended to apply the association analysis to estimate the duration of the project solely (Ahmed et al 2015) but rather as an auxiliary tool assessing the risk level of the chosen solution. The detection of the high risk (the high confidence of the occurrence of the significant delay) should be accompanied by a proposal of the reaction to the high risk detected (Ibadov 2017). The proposed tool suggests the solution by showing the combinations of unfavourable factors causing delays, where the confidence of the significant delay occurrence is much lower.…”
Section: Results Of the Rules Findingmentioning
confidence: 99%
“…It is not recommended to apply the association analysis to estimate the duration of the project solely (Ahmed et al 2015) but rather as an auxiliary tool assessing the risk level of the chosen solution. The detection of the high risk (the high confidence of the occurrence of the significant delay) should be accompanied by a proposal of the reaction to the high risk detected (Ibadov 2017). The proposed tool suggests the solution by showing the combinations of unfavourable factors causing delays, where the confidence of the significant delay occurrence is much lower.…”
Section: Results Of the Rules Findingmentioning
confidence: 99%
“…This (M-T) conjunction is discrete and proportional, but only in case of a low number of machines. When too many diggers are working at the same time on the limited area, their total efficiency is lower than the efficiency of a single machine multiplied by the number of machines [17]. This finding shows a low practical meaning as the contractors are not equipped with an unlimited number of machines.…”
Section: The Means Of Production and Time Of Work Execution (M-t)mentioning
confidence: 93%
“…The possibility of analysis and calculation making depends directly on the choice of the mathematical tool. The fuzzy set theory invented by L.A. Zadeh [26] seems a very good, suitable choice, as it is successfully applied in modelling variety of processes in the construction industry [1], [6][7][8], [12], [20][21][22][23]. Considering the type of the input data, modelling linguistic variables with fuzzy numbersaccording to the author's opinion -is justified.…”
Section: Alternative Net Model With a Fuzzy Decision Node The Core Anmentioning
confidence: 99%