2006
DOI: 10.3141/1981-21
|View full text |Cite
|
Sign up to set email alerts
|

Selection and Scheduling of Interdependent Transportation Projects with Island Models

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
14
0

Year Published

2012
2012
2021
2021

Publication Types

Select...
7

Relationship

2
5

Authors

Journals

citations
Cited by 11 publications
(14 citation statements)
references
References 15 publications
0
14
0
Order By: Relevance
“…Jong and Schonfeld (2001) used a GA method and evaluated project interactions by adapting a simple approximation model estimated from simulation results, but with lower precision than a simulation model. Tao and Schonfeld (2006) developed an island model (a variations of GA), while relying on equilibrium traffic assignment model to evaluate the impacts of transportation projects. They studied a network with eight nodes but they neither discussed the efficiency of their algorithm nor mentioned the goodness of their solution.…”
Section: Introductionmentioning
confidence: 99%
“…Jong and Schonfeld (2001) used a GA method and evaluated project interactions by adapting a simple approximation model estimated from simulation results, but with lower precision than a simulation model. Tao and Schonfeld (2006) developed an island model (a variations of GA), while relying on equilibrium traffic assignment model to evaluate the impacts of transportation projects. They studied a network with eight nodes but they neither discussed the efficiency of their algorithm nor mentioned the goodness of their solution.…”
Section: Introductionmentioning
confidence: 99%
“…Such advantages include the recognition and evaluation of benefits of interdependent projects [3][4][5][6], improved transparency of project ranking and options analysis, clear identification of the net gains of a program and improved rigour of analysis [7]. CARP is designed to capture all of the above-mentioned benefits of program evaluation as well as provides the flexibility to evaluate projects individually.…”
Section: Application Of Carp Modelmentioning
confidence: 99%
“… Evaluation period is 31 years (1 year of construction and 30 years of benefits);  All projects are assumed for simplicity to be constructed simultaneously 6 ;…”
mentioning
confidence: 99%
See 1 more Smart Citation
“…Shayanfar et al also investigated other metaheuristic methods, such as tabu search and simulated annealing, but concluded that the genetic algorithm was the most efficient method for converging to the optimal solution. Tao and Schonfeld () proposed an island model, as a variation of genetic algorithm, to optimize the road construction selection and scheduling under resource constraints. Kim, Kim, and Song () developed a model to sequence and schedule new road construction projects under a year‐to‐year budget constraint.…”
Section: Introductionmentioning
confidence: 99%