Day 2 Tue, October 29, 2013 2013
DOI: 10.2118/167443-ms
|View full text |Cite
|
Sign up to set email alerts
|

Selection and Optimization Study on Passive Inflow Control Devices by Numerical Simulation

Abstract: In long horizontal wells, production rate is typically higher at the heel than that at the toe. The resulting imbalanced production profile may cause early water or gas breakthrough into the wellbore. Once coning occurs, well production may be severely decreased due to limited flow contribution from the toe. To eliminate this imbalance, inflow control devices (ICDs) are placed in each screen joint to balance the production inflow profile across the entire lateral length and to compensate for permeability varia… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2014
2014
2023
2023

Publication Types

Select...
3
3

Relationship

1
5

Authors

Journals

citations
Cited by 11 publications
(2 citation statements)
references
References 5 publications
0
2
0
Order By: Relevance
“…A FD-AICD (fluid diode-type AICD) is composed of a Y-type splitting channel and external cyclone disk channel. The modified version and the phase selection controller (PSC) with a vortex disk have provided good results in the experiment. The fixed AICD has been applied in the Ginta oil field .…”
Section: Introductionmentioning
confidence: 99%
“…A FD-AICD (fluid diode-type AICD) is composed of a Y-type splitting channel and external cyclone disk channel. The modified version and the phase selection controller (PSC) with a vortex disk have provided good results in the experiment. The fixed AICD has been applied in the Ginta oil field .…”
Section: Introductionmentioning
confidence: 99%
“…Since a typical well with ICDs is usually in production from 5 to more than 20 years, the long-term reliability of such the device is crucial to the well's overall success. Thereby the ICDs must have certain performance features during every phase of the well's life to minimize or eliminate the undesirable results (Zeng et al, 2013). At the beginning of the drilling and production process, the ICDs must have a high plugging resistance for both the drilling and the completion fluids.…”
Section: Introductionmentioning
confidence: 99%