2022
DOI: 10.3390/en15051689
|View full text |Cite
|
Sign up to set email alerts
|

Sediment Transport Management Using the Planned Construction of the Lower Vistula Cascade as an Example

Abstract: Construction of the Włocławek Barrage on the Vistula River in 1970 became an important source of energy; however, it discontinued sediment transport in the Vistula River. This phenomenon resulted in accumulation before and erosion below the barrage; a similar problem can be expected due to the planned construction of the Lower Vistula Cascade. This study is dedicated to finding an effective and feasible solution to sediment transport management, acceptable to a wide group of users (e.g., navigation, energy pro… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 12 publications
0
0
0
Order By: Relevance