All Days 1972
DOI: 10.4043/1626-ms
|View full text |Cite
|
Sign up to set email alerts
|

SEDCO - 445 Dynamic Stationed Drill ship

Abstract: This paper deals with the design parameters, fabrication and sea trials of the first ship equipped for dynamic stationing having the specific requirements for drilling exploratory wells in open ocean environment.Design criteria are reviewed with regard to sea state, environment, propulsion requirements and drilling performance, including automatic control and sensing systems. Model studies and dynamic simulation analyses are presented and compared with the results of early sea trials.Operating systems are summ… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2016
2016
2016
2016

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…The SEDCO 445 was the world's first dynamically positioned, exploratory drilling vessel, developed between 1970 and 1974 in cooperation between SEDCO and Shell [9]. Its introduction marked a significant advance in deep-water drilling technology.…”
Section: Milestones: Sedco 445 -Glomar Explorer -Clementine II -Pla 2mentioning
confidence: 99%
“…The SEDCO 445 was the world's first dynamically positioned, exploratory drilling vessel, developed between 1970 and 1974 in cooperation between SEDCO and Shell [9]. Its introduction marked a significant advance in deep-water drilling technology.…”
Section: Milestones: Sedco 445 -Glomar Explorer -Clementine II -Pla 2mentioning
confidence: 99%