2023
DOI: 10.1016/j.nima.2022.167859
|View full text |Cite
|
Sign up to set email alerts
|

Scientific computing plan for the ECCE detector at the Electron Ion Collider

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
5

Relationship

1
4

Authors

Journals

citations
Cited by 9 publications
(1 citation statement)
references
References 18 publications
0
1
0
Order By: Relevance
“…Streaming readout is not required for the TPEX measurements as the time between bunches will be large (∼80 ms) leaving sufficient time to readout the detectors using a simple trigger based on the beam bunch clock. However, at the EIC streaming readout is widely accepted as the preferred and necessary approach to readout the large number channels from various detectors and present the data in a coordinated fashion to the clusters of computers that will select valid events and perform event reconstruction [12].…”
Section: Jinst 18 P09001mentioning
confidence: 99%
“…Streaming readout is not required for the TPEX measurements as the time between bunches will be large (∼80 ms) leaving sufficient time to readout the detectors using a simple trigger based on the beam bunch clock. However, at the EIC streaming readout is widely accepted as the preferred and necessary approach to readout the large number channels from various detectors and present the data in a coordinated fashion to the clusters of computers that will select valid events and perform event reconstruction [12].…”
Section: Jinst 18 P09001mentioning
confidence: 99%