2006
DOI: 10.1016/j.dam.2004.09.021
|View full text |Cite
|
Sign up to set email alerts
|

Scheduling workover rigs for onshore oil production

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

0
43
0

Year Published

2008
2008
2011
2011

Publication Types

Select...
3
3

Relationship

1
5

Authors

Journals

citations
Cited by 61 publications
(44 citation statements)
references
References 3 publications
0
43
0
Order By: Relevance
“…To our knowledge there is only one proposal heuristic to solve this problem, which uses VNS concepts [2]. However, the instances used in [2] are not available, making it difficult to compare with other proposals. In this paper we propose the development and experimental analyzis of GRASP algorithms to solve the SWRP.…”
Section: Introductionmentioning
confidence: 99%
See 4 more Smart Citations
“…To our knowledge there is only one proposal heuristic to solve this problem, which uses VNS concepts [2]. However, the instances used in [2] are not available, making it difficult to compare with other proposals. In this paper we propose the development and experimental analyzis of GRASP algorithms to solve the SWRP.…”
Section: Introductionmentioning
confidence: 99%
“…Oil can be lifted by different techniques, which require specialized equipment. As time passes maintenance service is necessary because of equipment failure, which is essential to the exploitation of the wells [2]. This service is performed by workover rigs, that are avaliable in a limited number because of the high cost of that equipment.…”
Section: Introductionmentioning
confidence: 99%
See 3 more Smart Citations