2015
DOI: 10.1080/00207543.2015.1005764
|View full text |Cite
|
Sign up to set email alerts
|

Scheduling to maximise worker satisfaction and on-time orders

Abstract: Two important managerial objectives incorporated in production planning are the maximisation of the on-time delivery of orders and worker satisfaction. While the maximisation of on-time deliveries has frequently been considered in past production planning research, the component of maximising worker satisfaction has typically been ignored. The assignment of workers to their preferred jobs is an important factor since it results in a productive working environment with high worker performance and a low turnover… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
9
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 24 publications
(9 citation statements)
references
References 19 publications
0
9
0
Order By: Relevance
“…GA [73] j-s (1) GA [74] f-s (1) DMORA [75] f-s (1) MOCGWO [76] j-s (5) GA [77] p-m X -con. [78] p-m X X heuristic [79] p-m X heuristic AP-Affecting Productivity, con.-constraint, DMORA-Discrete Multi-Objective Rider optimization Algorithm, EE-Energy Expenditure, EM-Effect Modeling, EP-Employee Preferences, ER-Ergonomic Risks, f-s-flow shop scheduling, GA-Genetic Algorithm, j-s-job shop scheduling, MOCGWO-Multi-Objective Cellular Grey Wolf Optimizer, p-m-parallel-machine scheduling, s-m-single-machine scheduling, VL-Value Limiting, (1)noise emission, (5)-combined/general assessment methods.…”
Section: Single-machine Parallel-machine Job Shop and Flow Shop Sched...mentioning
confidence: 99%
See 3 more Smart Citations
“…GA [73] j-s (1) GA [74] f-s (1) DMORA [75] f-s (1) MOCGWO [76] j-s (5) GA [77] p-m X -con. [78] p-m X X heuristic [79] p-m X heuristic AP-Affecting Productivity, con.-constraint, DMORA-Discrete Multi-Objective Rider optimization Algorithm, EE-Energy Expenditure, EM-Effect Modeling, EP-Employee Preferences, ER-Ergonomic Risks, f-s-flow shop scheduling, GA-Genetic Algorithm, j-s-job shop scheduling, MOCGWO-Multi-Objective Cellular Grey Wolf Optimizer, p-m-parallel-machine scheduling, s-m-single-machine scheduling, VL-Value Limiting, (1)noise emission, (5)-combined/general assessment methods.…”
Section: Single-machine Parallel-machine Job Shop and Flow Shop Sched...mentioning
confidence: 99%
“…Refs. [77,78] formulate a multi-objective function to maximize employee satisfaction as well as on-time delivery. Ref.…”
Section: Single-machine Parallel-machine Job Shop and Flow Shop Sched...mentioning
confidence: 99%
See 2 more Smart Citations
“…The results show that the number of workers assigned to each activity may have a positive or negative influence on its processing time. Ruiz‐Torres et al presented a new manpower scheduling model to maximize worker satisfaction. Some heuristic approaches are developed to solve the problem.…”
Section: Literature Reviewmentioning
confidence: 99%