2015
DOI: 10.1016/j.ejor.2015.05.003
|View full text |Cite
|
Sign up to set email alerts
|

Scheduling resource-constrained projects with a flexible project structure

Abstract: Scheduling resource-constrained projects with a flexible project structure Diskussionsbeitrag AbstractIn projects with a flexible project structure, the activities that have to be scheduled are not completely known beforehand. Instead, scheduling such a project includes the decision whether to carry out particular activities at all. This also effects precedence constraints between the finally implemented activities. However, established model formulations and solution approaches for the resource-constrained p… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
40
0

Year Published

2018
2018
2022
2022

Publication Types

Select...
10

Relationship

2
8

Authors

Journals

citations
Cited by 58 publications
(40 citation statements)
references
References 36 publications
(22 reference statements)
0
40
0
Order By: Relevance
“…Most, if not all, past research has classified these activities under categories B or C. Therefore, and worth highlighting, researchers have offered different algorithms as a way to find the best solution for each of the three types of classification, each taken individually. However, the problem is: researchers have classified the project activities individually under categories A, B, or C (e.g., Peteghem and Vanhoucke 2010; Kellenbrink and Helber 2015). However, in practice, in most engineering projects, if not all, some of these activities can be classified under category D rather than category B or C to give the manager more flexibility in scheduling and planning projects.…”
Section: Fig 6 An Activity Classified Under Category Dmentioning
confidence: 99%
“…Most, if not all, past research has classified these activities under categories B or C. Therefore, and worth highlighting, researchers have offered different algorithms as a way to find the best solution for each of the three types of classification, each taken individually. However, the problem is: researchers have classified the project activities individually under categories A, B, or C (e.g., Peteghem and Vanhoucke 2010; Kellenbrink and Helber 2015). However, in practice, in most engineering projects, if not all, some of these activities can be classified under category D rather than category B or C to give the manager more flexibility in scheduling and planning projects.…”
Section: Fig 6 An Activity Classified Under Category Dmentioning
confidence: 99%
“…RCPSP-MR problems can be regarded in the scheduling of projects, such as mechanizing various production line, launching SCADA systems, launching smart urban systems, dispatching liquid reservoirs fuel, launching different vehicle tracking systems, developing educational simulators, developing electronic Siebel for shooting training and reverse engineering of critical and important equipment. Also, RCPSP-MR is defined and described in this paper is indicated in flexible manufacturing cells (FMCs) according to the related literature [e.g., [42][43][44][45][46][47][48][49][50][51][52][53][54][55].…”
Section: Introductionmentioning
confidence: 99%
“…Aircraft engine remanufacturing is executed by independent service contractors or original equipment manufacturers. In either case, this complex process typically has a project character, see Kellenbrink and Helber (2015) and Kellenbrink and Helber (2016), as the state of the engines as well as the chosen repair or replace options differ from case to case. The customers are typically airlines that are interested in short remanufacturing processes.…”
Section: Projects With Flexible Capacity Constraints Makespan-dependmentioning
confidence: 99%