Scheduling preemptable tasks on parallel processors with limited availability

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
87
0
2

Year Published

2001
2001
2022
2022

Publication Types

Select...
7

Relationship

1
6

Authors

Journals

citations
Cited by 55 publications
(89 citation statements)
references
References 14 publications
0
87
0
2
Order By: Relevance
“…The late work models the amount of work not executed on time, which determines, e.g., the loss of income caused by not executing parts of jobs on time, the fine which has to be paid to customers in case of delay, or just the amount of work which has to be scheduled in the following interval, because it was not completed in the assumed planning horizon. Jobs may also model pieces of information (Blazewicz 1984) which have to be collected by sensing devices before a given deadline. Minimizing late work corresponds to minimizing information loss, directly influencing the efficiency of control algorithms.…”
Section: Problem Definition and Related Workmentioning
confidence: 99%
See 3 more Smart Citations
“…The late work models the amount of work not executed on time, which determines, e.g., the loss of income caused by not executing parts of jobs on time, the fine which has to be paid to customers in case of delay, or just the amount of work which has to be scheduled in the following interval, because it was not completed in the assumed planning horizon. Jobs may also model pieces of information (Blazewicz 1984) which have to be collected by sensing devices before a given deadline. Minimizing late work corresponds to minimizing information loss, directly influencing the efficiency of control algorithms.…”
Section: Problem Definition and Related Workmentioning
confidence: 99%
“…Late work parameter, Y j , was first introduced by Blazewicz (1984), who called it information loss, referring to a possible application of this performance measure in control systems. The phrase late work was proposed by Potts and Van Wassenhove (1991), who denoted this parameter as V j , which appears in the literature alongside Y j .…”
Section: Problem Definition and Related Workmentioning
confidence: 99%
See 2 more Smart Citations
“…Porto et al [28] apply the tabu search algorithm to the static task scheduling problem in a heterogeneous multiprocessor environment under precedence constraints. More task scheduling algorithms are addressed in [29][30][31][32][33][34][35][36][37][38].…”
Section: Related Workmentioning
confidence: 99%