Scheduling Optimization of Prefabricated Construction Projects by Genetic Algorithm

Abstract: Prefabricated buildings are the direction of the future development of the construction industry and have received widespread attention. The effective execution of prefabricated construction project scheduling should consider resource constraints and the supply arrangement of prefabricated components. However, the traditional construction resource-constrained project scheduling implementation method cannot simultaneously consider the characteristics of the linkage between component production and on-site assem… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
6
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 26 publications
(6 citation statements)
references
References 76 publications
(84 reference statements)
0
6
0
Order By: Relevance
“…The main disadvantage is that the user may not always obtain the optimum solution. Since the early 1990s, genetic algorithms have been extensively used for solving RCPS problems (GA) [3,[12][13][14]. Other meta-heuristic methods such as tabu-search [15], simulated annealing [16], ant colony algorithm [17] and the artificial bee colony with differential evolution [18] were applied.…”
Section: Literature Reviewmentioning
confidence: 99%
See 1 more Smart Citation
“…The main disadvantage is that the user may not always obtain the optimum solution. Since the early 1990s, genetic algorithms have been extensively used for solving RCPS problems (GA) [3,[12][13][14]. Other meta-heuristic methods such as tabu-search [15], simulated annealing [16], ant colony algorithm [17] and the artificial bee colony with differential evolution [18] were applied.…”
Section: Literature Reviewmentioning
confidence: 99%
“…One of the outcomes of RCPS is activity start and finish times that conform to precedence relationships and satisfy resource constraints. RCPS techniques were used in various fields such as prefabricated construction [3], optimizing 2 of 16 time, cost and energy consumption [4], improving sustainability in construction [5], and financial optimization [6].…”
Section: Introductionmentioning
confidence: 99%
“…Besides, it has its own uniqueness: (1) large investment in construction projects, (2) long construction plan period, (3) more uncertain factors and risks, (4) large number of participants, etc. [ 6 , 7 ].…”
Section: Introduction Of Construction Project Costmentioning
confidence: 99%
“…Liu et al [ 18 ] considered the factors of the material supply, cost constraints and various labor modes, established a model with the minimum construction project duration as the primary goal, and effectively solved the abovementioned problem. Xie et al [ 19 ] focused on the constraints of the prefabricated component supply for prefabricated buildings, conducted in-depth research on the corresponding scheduling problem, effectively and reasonably distributed resources and reduced the completion time.…”
Section: Introductionmentioning
confidence: 99%