2012 IEEE International Conference on Complex Systems (ICCS) 2012
DOI: 10.1109/icocs.2012.6458565
|View full text |Cite
|
Sign up to set email alerts
|

Scheduling of real-time embedded systems under reliability and power constraints

Abstract: In this paper, we present a new tri-criteria scheduling heuristic for scheduling data-flow graphs of operations onto parallel heterogeneous architectures according to three criteria: first the minimization of the schedule length crucial for real-time systems, second the maximization of the system reliability crucial for dependable systems, and third minimizing energy consumption crucial for autonomous systems. The proposed algorithm is a list scheduling heuristics, It uses the active replication of operations … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
0

Year Published

2013
2013
2022
2022

Publication Types

Select...
5
1
1

Relationship

3
4

Authors

Journals

citations
Cited by 9 publications
(5 citation statements)
references
References 10 publications
0
5
0
Order By: Relevance
“…Assayad et al [78] have proposed a heuristic-based scheduling algorithm considering three criteria: a) minimizing the length of the schedule in real-time systems, b) maximizing the reliability in dependable systems, and c) minimizing energy in autonomous systems. Their proposed method maximizes reliability through active replication and employs DVS to reduce power consumption.…”
Section: B Replicationmentioning
confidence: 99%
“…Assayad et al [78] have proposed a heuristic-based scheduling algorithm considering three criteria: a) minimizing the length of the schedule in real-time systems, b) maximizing the reliability in dependable systems, and c) minimizing energy in autonomous systems. Their proposed method maximizes reliability through active replication and employs DVS to reduce power consumption.…”
Section: B Replicationmentioning
confidence: 99%
“…Authors in [9] proposed a scheduling heuristic to minimize the schedule length, the global system failure rate and the power consumption of the generated schedule. Active replication of tasks and data dependencies is used to increase the system reliability and dynamic voltage scaling DVS is used for energy minimization.…”
Section: Related Workmentioning
confidence: 99%
“…The energy model used in this work is the same to the one, used in the literature [1,6,9,22], where the power consumption P of a system is given by…”
Section: Energy Modelmentioning
confidence: 99%
“…1). In this paper, we present our latest work on dependability of real-time embedded systems [3], [4], [5]. The approach that we propose is a scheduling algorithm based on data fragmentation.…”
Section: Introductionmentioning
confidence: 99%