Proceedings of the International Symposium on Low Power Electronics and Design 2018
DOI: 10.1145/3218603.3218609
|View full text |Cite
|
Sign up to set email alerts
|

Scheduling of Hybrid Battery-Supercapacitor Control Instructions for Longevity in Systems with Power Gating

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
13
0

Year Published

2019
2019
2019
2019

Publication Types

Select...
1
1

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(13 citation statements)
references
References 10 publications
0
13
0
Order By: Relevance
“…Scheduling of hybrid battery‐SC considering a B‐SC model for systems with instruction controlled PG has been introduced in [2]. The instruction db disconnects the battery from the PG components if the charge in the SC greater than or equal to the charge required by wake up of PG components.…”
Section: Related Workmentioning
confidence: 99%
See 4 more Smart Citations
“…Scheduling of hybrid battery‐SC considering a B‐SC model for systems with instruction controlled PG has been introduced in [2]. The instruction db disconnects the battery from the PG components if the charge in the SC greater than or equal to the charge required by wake up of PG components.…”
Section: Related Workmentioning
confidence: 99%
“…Vbatt and Vdd are constants, whereas Iload varies with processor workload. The capacities of the battery and the SC in B‐SC are considered as QB and QSC charge units, respectively [2]. In B‐2SC, the capacities of B and each normalSCσ are considered to be QB and trueQSC2 charge units, respectively, where normalSCσthickmathspacenormal∀σfalsefalse{0,thinmathspace1falsefalse} are connected to each other in a parallel configuration.…”
Section: Hybrid B‐2sc Systemmentioning
confidence: 99%
See 3 more Smart Citations