Scheduling of directed acyclic graphs by a genetic algorithm with a repairing mechanism

Abstract: This study has developed a genetic algorithm (GA) approach to the problem of task scheduling for multiprocessor systems. The proposed GA implements the local repairing mechanism and the penalty method, and it does not need tuning of any parameters for high performance. Comparison with other scheduling methods, based on a GA approach, indicates that the proposed GA is competitive in solution quality and also computational cost.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
3
1
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(3 citation statements)
references
References 17 publications
(36 reference statements)
0
3
0
Order By: Relevance
“…The models are equivalent if all delays are machine delays, so our machine delay results hold in the alternate model. The models differ in the presence of general job delays but are equivalent in several special cases, for instance in the setting where the job DAG is transitively closed, which has been extensively studied and proved useful in several important applications [34,4,93].…”
Section: Job Delays and Symmetric Machine Delaysmentioning
confidence: 99%
See 2 more Smart Citations
“…The models are equivalent if all delays are machine delays, so our machine delay results hold in the alternate model. The models differ in the presence of general job delays but are equivalent in several special cases, for instance in the setting where the job DAG is transitively closed, which has been extensively studied and proved useful in several important applications [34,4,93].…”
Section: Job Delays and Symmetric Machine Delaysmentioning
confidence: 99%
“…). There exists a polynomial time algorithm to compute a valid machine delays schedule with makespan O((log n) 4 (opt + ρ max )).…”
Section: Theorem 3 (Machine Delays Approximationmentioning
confidence: 99%
See 1 more Smart Citation