1993
DOI: 10.1016/0098-1354(93)80059-v
|View full text |Cite
|
Sign up to set email alerts
|

Scheduling of batch digesters according to different control targets and servicing limitations

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

1995
1995
2014
2014

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 10 publications
(3 citation statements)
references
References 5 publications
0
3
0
Order By: Relevance
“…Hvala et al proposed a solution procedure based on a heuristic algorithm combining a neighborhood search technique to determine the most suitable digester sequence and linear programming to calculate the batch start and completion times for a set of seven batch digesters. They considered a cyclic repetition of phases and the system consisted of two parallel production lines with shared resource limitations.…”
Section: Literature Review On the Scheduling Of Pulp Plantsmentioning
confidence: 99%
See 1 more Smart Citation
“…Hvala et al proposed a solution procedure based on a heuristic algorithm combining a neighborhood search technique to determine the most suitable digester sequence and linear programming to calculate the batch start and completion times for a set of seven batch digesters. They considered a cyclic repetition of phases and the system consisted of two parallel production lines with shared resource limitations.…”
Section: Literature Review On the Scheduling Of Pulp Plantsmentioning
confidence: 99%
“…Considering a system of processes and storage tanks between them, a method based on a well-known optimization algorithm was proposed relying on a discretetime representation, which was considered the most natural way to describe the problem. Hvala et al 17 proposed a solution procedure based on a heuristic algorithm combining a neighborhood search technique to determine the most suitable digester sequence and linear programming to calculate the batch start and completion times for a set of seven batch digesters. They considered a cyclic repetition of phases and the system consisted of two parallel production lines with shared resource limitations.…”
Section: Literature Review On the Scheduling Of Pulp Plantsmentioning
confidence: 99%
“…Another way is to manipulate the process condition in response to uncertainty based on a fixed operating strategy. , An example of this type of manipulation is the adjustment of the operation parameters to use a fixed schedule. However, it cannot be applied generally, because there is not much room for modification in actual complex processes.…”
Section: Introductionmentioning
confidence: 99%