Scheduling Model for Prefabricated Component Assembly, Production, and Transportation Stage Based on GA for Prefabricated Buildings
Zhipeng Huo,
Xiaoqiang Wu,
Tao Cheng
Abstract:With the development of prefabricated buildings in China, the demand for prefabricated components is also increasing. The construction schedule of prefabricated components has heterogeneity and timeliness, which makes the traditional scheduling models not applicable. In order to control the construction process and reduce costs, research is conducted on controlling the construction process of prefabricated components in prefabricated buildings. This study divides the construction process into three stages acco… Show more
Set email alert for when this publication receives citations?
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.