2024
DOI: 10.1109/access.2024.3394510
|View full text |Cite
|
Sign up to set email alerts
|

Scheduling Model for Prefabricated Component Assembly, Production, and Transportation Stage Based on GA for Prefabricated Buildings

Zhipeng Huo,
Xiaoqiang Wu,
Tao Cheng

Abstract: With the development of prefabricated buildings in China, the demand for prefabricated components is also increasing. The construction schedule of prefabricated components has heterogeneity and timeliness, which makes the traditional scheduling models not applicable. In order to control the construction process and reduce costs, research is conducted on controlling the construction process of prefabricated components in prefabricated buildings. This study divides the construction process into three stages acco… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 31 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?