2010
DOI: 10.1016/j.ejor.2010.03.014
|View full text |Cite
|
Sign up to set email alerts
|

Scheduling elective surgery under uncertainty and downstream capacity constraints

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
106
0
2

Year Published

2012
2012
2020
2020

Publication Types

Select...
5
3
2

Relationship

0
10

Authors

Journals

citations
Cited by 213 publications
(122 citation statements)
references
References 26 publications
0
106
0
2
Order By: Relevance
“…Model lain, dengan menggunakan pemrograman stokastik dibahas oleh Min dan Yih [6] dengan cara metode penaksiran rata-rata sampel untuk mendapatkan jadwal operasi optimal dengan tujuan meminimumkan biaya pasien dan biaya waktu lembur ruang operasi yang digunakan.…”
Section: Gambar 1 Simulasi Block Rooms Dan Open Posting Rooms (Weissunclassified
“…Model lain, dengan menggunakan pemrograman stokastik dibahas oleh Min dan Yih [6] dengan cara metode penaksiran rata-rata sampel untuk mendapatkan jadwal operasi optimal dengan tujuan meminimumkan biaya pasien dan biaya waktu lembur ruang operasi yang digunakan.…”
Section: Gambar 1 Simulasi Block Rooms Dan Open Posting Rooms (Weissunclassified
“…Guido [30] as well as Min and Yih [65] argue that a surgery schedule should consider patient priority and that inadequate consideration of patient priority may result in a suboptimal and ineffective schedule. In general, non-elective patients get priority over the patients in the elective schedule and often it is the attending staff surgeon who decides on the exact order.…”
Section: Categorization and Prioritizationmentioning
confidence: 99%
“…Stochastic programming has been applied in various health care settings. [27] developed a stochastic program to include uncertainty in surgery durations and length of stay for operating room scheduling, [3] used a stochastic programming approach for nurse scheduling, and [37] applied stochastic programming to appointment scheduling. To the best of our knowledge, stochastic programming has not been applied to multi-appointment planning with uncertain patient routing before.…”
Section: Formal Problem Description and Solution Approachmentioning
confidence: 99%