2011
DOI: 10.1007/s13727-012-0006-x
|View full text |Cite
|
Sign up to set email alerts
|

Scheduling and Rescheduling of Railway Operations: A Review and Expository Analysis

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
20
0

Year Published

2015
2015
2021
2021

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 36 publications
(20 citation statements)
references
References 66 publications
0
20
0
Order By: Relevance
“…This is also a conclusion of [31] and [63]; approaches that make available instances to the community still rare [30] mostly due to intellectual property and confidentiality issues.…”
Section: Level Of Detail and Layout Of Infrastructurementioning
confidence: 88%
See 2 more Smart Citations
“…This is also a conclusion of [31] and [63]; approaches that make available instances to the community still rare [30] mostly due to intellectual property and confidentiality issues.…”
Section: Level Of Detail and Layout Of Infrastructurementioning
confidence: 88%
“…4. This is the simpler setting and can be, for instance, assumed for planned operations, such as maintenance, or if the reliability of predictions is very high (for instance, in closed systems) [63].…”
Section: A Complete Knowledge Of the Futurementioning
confidence: 99%
See 1 more Smart Citation
“…There have been some reviews on the topic of scheduling or rescheduling in railway systems [1], [2], [9]- [11]. Our paper has added to this body of literature by carrying out a far more comprehensive review of more recent papers in rescheduling.…”
Section: Rescheduling In Railway Networkmentioning
confidence: 99%
“…The management of a railway system can be divided into four levels, which are strategic, tactical, operational and rescheduling [1], [2]. These four hierarchical levels are different in the decision levels and interrelated with each other during the operations.…”
mentioning
confidence: 99%