2013
DOI: 10.1134/s0361768813050034
|View full text |Cite
|
Sign up to set email alerts
|

Scheduling algorithms for real-time computing systems admitting simulation models

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
2
0
1

Year Published

2014
2014
2015
2015

Publication Types

Select...
4
1
1

Relationship

2
4

Authors

Journals

citations
Cited by 13 publications
(3 citation statements)
references
References 10 publications
0
2
0
1
Order By: Relevance
“…The constraints on the time of schedule execution and the reliability requirements on the computer system must be observed at that [8]. The reader is referred to [8][9][10] for detailed description and substantiation of building the annealing simulation algorithms to solve the problems of building the multiprocessor schedules.…”
Section: Annealing Simulation Algorithm To Build the Multiprocessor Smentioning
confidence: 99%
“…The constraints on the time of schedule execution and the reliability requirements on the computer system must be observed at that [8]. The reader is referred to [8][9][10] for detailed description and substantiation of building the annealing simulation algorithms to solve the problems of building the multiprocessor schedules.…”
Section: Annealing Simulation Algorithm To Build the Multiprocessor Smentioning
confidence: 99%
“…Problems of scheduling in real time systems [5][6][7][8][9][10] are viewed as the closest problems in terms of the assured compliance with the SLA. In these problems, the constraints placed on the feasible time of exe cuting applied programs or program processes are used as the SLA criteria that cannot be violated.…”
Section: Introductionmentioning
confidence: 99%
“…Задачи, связанные с календарным планированием [1][2][3][4][5], могут быть эффективно решены с исполь-зованием методов исследования операций, что позволяет сократить сроки выполнения заказов, повысить плотность загрузки оборудования, а также оперативность составления и корректирования планов. Вслед-ствие больших объемов раскраиваемого сырья на предприятии сокращение непроизводственных просто-ев даже на 3-4% является актуальной и востребованной задачей.…”
Section: Introductionunclassified