2018
DOI: 10.1080/22348972.2018.1498289
|View full text |Cite
|
Sign up to set email alerts
|

Scheduled operation of wind farm with a battery-energy-storage system considering ramp events

Abstract: Renewable energy such as wind generation is a countermeasure against global warming and fossil-energy resource depletion. However, wind-farm (WF) output fluctuates because of unstable wind conditions and the occurrence of long-term fluctuations, which are called ramp events. WF power generation operator needs to observe the grid code (GC) by controlling wind generators themselves or adjusting a WF output with the energy-storage system (ESS). Accordingly, scheduling the operation of WF with ESS and WF output fo… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
7
0

Year Published

2018
2018
2022
2022

Publication Types

Select...
3
1
1

Relationship

3
2

Authors

Journals

citations
Cited by 5 publications
(7 citation statements)
references
References 8 publications
0
7
0
Order By: Relevance
“…In this section, the basic scheduling model is explained. The basic scheduling model has been proposed in Reference [16], whose purpose is to manage SOC while meeting GC for suppressing ramp fluctuations. The objective function and constraints are shown below.…”
Section: Basic Scheduling Modelmentioning
confidence: 99%
See 2 more Smart Citations
“…In this section, the basic scheduling model is explained. The basic scheduling model has been proposed in Reference [16], whose purpose is to manage SOC while meeting GC for suppressing ramp fluctuations. The objective function and constraints are shown below.…”
Section: Basic Scheduling Modelmentioning
confidence: 99%
“…Ramp events threaten the reliable and economic operation of power systems [4]. In recent years, this phenomenon has been studied by working in the fields of analysis [4][5][6][7][8][9][10][11], forecasting [12], and control [13][14][15][16][17][18]. In terms of analytical studies, time series measured at offshore WFs in Horns Rev., Denmark, have been compared to a time series simulated based on the power fluctuation model presented in Reference [5].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…In our previous research, 20,21 we investigated scheduled operation of WF to handle ramp events. Thus we proposed a deterministic programming (DP) method in which forecast data of WF output were treated as definite values.…”
Section: Introductionmentioning
confidence: 99%
“…In our previous research, we investigated scheduled operation of WF to handle ramp events. Thus we proposed a deterministic programming (DP) method in which forecast data of WF output were treated as definite values.…”
Section: Introductionmentioning
confidence: 99%