2020
DOI: 10.1109/tpwrs.2020.2985572
|View full text |Cite
|
Sign up to set email alerts
|

Scenario-Wise Distributionally Robust Optimization for Collaborative Intermittent Resources and Electric Vehicle Aggregator Bidding Strategy

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
15
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
6
2
1

Relationship

0
9

Authors

Journals

citations
Cited by 42 publications
(15 citation statements)
references
References 34 publications
0
15
0
Order By: Relevance
“…Most existing studies [3,12,13,21,31] considered the EVA operation in day-ahead electricity market, as EVA should plan the charging scheduling for each EV beforehand. Specifically, [13] proposed an optimal operation strategy for an EVA, which performs energy arbitrage in the energy market and provides ancillary services from aggregated EVs, while providing charging services to EVs to maximize the profit in a future energy market.…”
Section: Vehicle-to-grid (V2g) 31 Energy Trading In the Electricity M...mentioning
confidence: 99%
“…Most existing studies [3,12,13,21,31] considered the EVA operation in day-ahead electricity market, as EVA should plan the charging scheduling for each EV beforehand. Specifically, [13] proposed an optimal operation strategy for an EVA, which performs energy arbitrage in the energy market and provides ancillary services from aggregated EVs, while providing charging services to EVs to maximize the profit in a future energy market.…”
Section: Vehicle-to-grid (V2g) 31 Energy Trading In the Electricity M...mentioning
confidence: 99%
“…DRO has relatively simple requirements on uncertainty with respect to stochastic programming, as well as a simple mathematical tractability. Recent applications refer to optimisation of energy hub operation (Zhao et al, 2020) and determination of bidding strategy models for aggregators (Hajebrahimi et al, 2020). 6) Model predictive control (MPC): for data-driven applications, new data may become available during time in dynamic processes.…”
Section: Certainty: Handling Uncertaintiesmentioning
confidence: 99%
“…Gong et al [27] developed the optimum bidding model in which the thermal-wind hybrid system signs bilateral contracts with the battery swapping station and participates in the DA market. [27][28][29][30][31], EVPLs and line capacities are not considered in these studies. Also, bilateral contracts were not included in studies other than [27].…”
Section: Relevant Backgroundmentioning
confidence: 99%
“…Also, bilateral contracts were not included in studies other than [27]. While risk management is covered only in [28,30], portfolio structure is only considered in [28,29,31] Aliasghari et al [33] proposed a structure where the renewable microgrid in the presence of plug-in EVs participates in the power market minimizing the operating cost. Aghajani and Kalantar [34] presented a bidding strategy for the DA market and reserve market participation, in the joint operation of WPP, EVPL, and load retailer.…”
Section: Relevant Backgroundmentioning
confidence: 99%