Proceedings of the 18th International Seminar on Paste and Thickened Tailings 2015
DOI: 10.36487/acg_rep/1504_06_javadi
|View full text |Cite
|
Sign up to set email alerts
|

Sarcheshmeh Copper Mine paste plant design, start-up and early operation overview

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2021
2021
2021
2021

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…Even though there were initial commissioning problems, importantly, the requirement to produce a thickened tailings at the design requirement of 59 to 60%m at an unsheared yield stress of 150 Pa was met (Javadi et al 2015).…”
Section: Application In Large Tonnage Operationsmentioning
confidence: 99%
“…Even though there were initial commissioning problems, importantly, the requirement to produce a thickened tailings at the design requirement of 59 to 60%m at an unsheared yield stress of 150 Pa was met (Javadi et al 2015).…”
Section: Application In Large Tonnage Operationsmentioning
confidence: 99%
“…The current tailings production rate is approximately 29 Mtpa. The mine utilises 12 existing paste thickeners to produce paste with a consistency of approximately 59% (w/w) solids concentration (Javadi et al 2015). The thickened tailings are distributed evenly into two arms (western and eastern streams) which eventually merge together just before the tailings embankment.…”
Section: Introductionmentioning
confidence: 99%