SPE Annual Technical Conference and Exhibition 1981
DOI: 10.2118/10212-ms
|View full text |Cite
|
Sign up to set email alerts
|

SALM Installation in Santa Barbara Channel

Abstract: Oil and gas production has been underway in Exxon's Hondo Field since April 1981. The field is being developed using a 945-foot drilling and production platform, the Hondo Platform, and an production platform, the Hondo Platform, and an offshore storage and treating vessel, the Exxon Santa Ynez. The dedicated 50,000 dwt vessel is moored to a single anchor leg type production riser which provides the connection to the three subsea pipelines and a power cable from the Hondo Platform. This paper presents the inst… Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles