1996
DOI: 10.1109/24.488922
|View full text |Cite
|
Sign up to set email alerts
|

Safety assessment, reliability, and the probability-operation diagram

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

1999
1999
2007
2007

Publication Types

Select...
2
1
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(3 citation statements)
references
References 5 publications
0
3
0
Order By: Relevance
“…In order to solve the equation set crePoss o AssCreM = crePoss, the fuzzy Markov chain model [10] is used. Since AssCreM is a fuzzy transitive matrix, crePoss should be an eigen-fuzzy set.…”
Section: Solution Of the Equation Setmentioning
confidence: 99%
See 1 more Smart Citation
“…In order to solve the equation set crePoss o AssCreM = crePoss, the fuzzy Markov chain model [10] is used. Since AssCreM is a fuzzy transitive matrix, crePoss should be an eigen-fuzzy set.…”
Section: Solution Of the Equation Setmentioning
confidence: 99%
“…In other words, such propagation of credibility confirmation is a desired property. In order to determine source credibility, many approaches such as probability theory [10], Bayesian theory [2,3] and possibility theory [4,6] can be used. Considering the nature of vagueness in knowledge grid environments, mainly caused by the lack of knowledge rather than the randomized functionality of the system, the use of possibility theory for the modeling of these systems seems to be more appropriate than probability theory.…”
Section: Introductionmentioning
confidence: 99%
“…An independent safety-assessment (especially when a topdown method is used) shows the proper information which must be collected by an accident investigation as well as during usual system-use, and stored in a data-bank so that an acceptable system-safety monitoring function can be carried out [8].…”
Section: Safety Auditing Processmentioning
confidence: 99%