2012
DOI: 10.1016/j.sbspro.2012.06.1053
|View full text |Cite
|
Sign up to set email alerts
|

SAFEDOR–The Implementation of Risk-based Ship Design and Approval

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
0
3

Year Published

2015
2015
2022
2022

Publication Types

Select...
4
2
1

Relationship

0
7

Authors

Journals

citations
Cited by 18 publications
(8 citation statements)
references
References 9 publications
0
5
0
3
Order By: Relevance
“…In order to establish the safety of the proposed system, the recommended techniques in IEC 61508 for Functional Safety of Electrical/Electronic/Programmable Electronic Safety-related Systems [12] (of which POMES is an example) and ISO/IEC 12207 for Systems and software engineering [13] are used. A major activity is hazard identification, followed by risk assessment, leading to risk analysis and mitigations for the identified relevant hazards.…”
Section: Critical Condition Analysismentioning
confidence: 99%
“…In order to establish the safety of the proposed system, the recommended techniques in IEC 61508 for Functional Safety of Electrical/Electronic/Programmable Electronic Safety-related Systems [12] (of which POMES is an example) and ISO/IEC 12207 for Systems and software engineering [13] are used. A major activity is hazard identification, followed by risk assessment, leading to risk analysis and mitigations for the identified relevant hazards.…”
Section: Critical Condition Analysismentioning
confidence: 99%
“…For example, the process described here includes risk as a driver to design requirements development and thereby resembles the "risk informed design" methodology recommended by NASA (NASA 2010) and commonly used in the nuclear power industry. The activity model highlights the points in the design process when probabilistic and stochastic methods can be used to analyze risk and in this way the methodology resembles the "risk-based design" process being implemented in marine design (Breinholt 2012) and the petroleum industry. The methodology also incorporates the analysis of residual risk, as mandated by FDA guidelines and ISO 14971, and in this respect has some similarity to the "performance-based risk management" common in many regulated industries such as the nuclear power industry (NRC 2007 Technical Approach…”
Section: Introductionmentioning
confidence: 99%
“…Al introducirse en el diseño para alcanzar unos objetivos de seguridad surge el "diseño basado en riesgos" [68]. Para aplicar esto es necesario seguir los siguientes principios:…”
Section: Diseño Basado En Riesgosunclassified
“…Estos permiten, al usar herramientas de diseño en el modelo, ver cómo se compensan los aspectos de seguridad cuando se solapen. En este caso el proceso de optimización del diseño se convierte en un caso típico de optimización multiobjetivo y multi-criterio [68].…”
Section: Gestión Del Procesounclassified
See 1 more Smart Citation