2018
DOI: 10.1155/2018/7635878
|View full text |Cite
|
Sign up to set email alerts
|

ROSA/LSTF Tests and Posttest Analyses by RELAP5 Code for Accident Management Measures during PWR Station Blackout Transient with Loss of Primary Coolant and Gas Inflow

Abstract: Three tests were carried out with the ROSA/LSTF (rig of safety assessment/large-scale test facility), which simulated accident management (AM) measures during station blackout transient with loss of primary coolant under assumptions of nitrogen gas inflow and total failure of high-pressure injection system in a pressurized water reactor. As the AM measures, steam generator (SG) secondary-side depressurization was done by fully opening the relief valves in both SGs, and auxiliary feedwater was injected into the… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2019
2019
2021
2021

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
references
References 21 publications
0
0
0
Order By: Relevance