All Days 2011
DOI: 10.4043/21226-ms
|View full text |Cite
|
Sign up to set email alerts
|

Roncador P-52 Hybrid Riser Review: Key Concepts, Construction and Installation Challenges

Abstract: The first Petrobras Hybrid Riser was installed in Campos Basin and is part of the Roncador P-52 oil export system. This system, which connects the SS platform P-52 (1800m water depth) to the fixed unit PRA-1 (100m water depth), is in operation since November 2007 comprises an 18 in diameter flowline and the Free Standing Hybrid Riser (FSHR). The FSHR is composed by a grouted foundation, 1500m of rigid steel riser, a near surface Buoyancy Can and a flexible jumper connecting the top of rigid riser to the platfo… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 3 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?