2020
DOI: 10.1007/s10064-020-01861-4
|View full text |Cite
|
Sign up to set email alerts
|

Rockburst prediction model based on comprehensive weight and extension methods and its engineering application

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
14
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
9
1

Relationship

0
10

Authors

Journals

citations
Cited by 34 publications
(16 citation statements)
references
References 36 publications
0
14
0
Order By: Relevance
“…Based on the MFICM proposed in this study, five sections of a diversion tunnel of Jinping II hydropower station are analyzed. The index measured data and prediction results of each section of a diversion tunnel are shown in Table 11 (Zhang et al 2020). It can be seen from Table 11 that the prediction results of the MFICM exhibit extremely good agreement with the actual situations and better accuracy than other methods.…”
Section: Risk Prediction Of Rock Burst Of the Diversion Tunnel In Jinping II Hydropower Stationmentioning
confidence: 95%
“…Based on the MFICM proposed in this study, five sections of a diversion tunnel of Jinping II hydropower station are analyzed. The index measured data and prediction results of each section of a diversion tunnel are shown in Table 11 (Zhang et al 2020). It can be seen from Table 11 that the prediction results of the MFICM exhibit extremely good agreement with the actual situations and better accuracy than other methods.…”
Section: Risk Prediction Of Rock Burst Of the Diversion Tunnel In Jinping II Hydropower Stationmentioning
confidence: 95%
“…Fig. 8 Rock burst conditions of the diversion tunnels at BK6+754 (a) and at AK9+485~490 (b) of Jinping II hydropower station (Zhang et al 2020).…”
Section: Risk Prediction Of Rock Burst Of the Diversion Tunnel In Jinping II Hydropower Stationmentioning
confidence: 99%
“…The above models have achieved favorable prediction results in many projects. Considering the difficulty in obtaining rock mass parameters quickly and accurately during excavation, these models are tough to conduct real-time rockburst prediction, which are more applied to long-term prediction in engineering investigation stage (Zhang et al 2020;Zhou et al 2020).…”
Section: Introductionmentioning
confidence: 99%