2019
DOI: 10.1049/iet-gtd.2019.1439
|View full text |Cite
|
Sign up to set email alerts
|

Robust UC model based on multi‐band uncertainty set considering the temporal correlation of wind/load prediction errors

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
44
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 52 publications
(44 citation statements)
references
References 30 publications
0
44
0
Order By: Relevance
“…It is recognized by researchers that the coordinated optimization of generation and transmission system would achieve a more reliable and economical solution [5]- [8]. In addition, various challenges brought by uncertainties of power generation, load and transmission line could be addressed well via robust optimization [9]- [10]. To further include the spatiotemporal correlation of uncertainty prediction error, a linear polyhedral uncertain set in introduced in references [11]- [12].…”
Section: B Literature Reviewmentioning
confidence: 99%
See 3 more Smart Citations
“…It is recognized by researchers that the coordinated optimization of generation and transmission system would achieve a more reliable and economical solution [5]- [8]. In addition, various challenges brought by uncertainties of power generation, load and transmission line could be addressed well via robust optimization [9]- [10]. To further include the spatiotemporal correlation of uncertainty prediction error, a linear polyhedral uncertain set in introduced in references [11]- [12].…”
Section: B Literature Reviewmentioning
confidence: 99%
“…Power system uncertainties are not considered in these cases for the sake of comparison. In Case 1, only four assets are invested over the five-year horizon, where candidate units G1 and G3, and candidate transmission lines L3 and L11 are constructed with a total cost of $1.3704×10 9 . However, overloads and under voltage issues happen in the system, which may require addition investment in generating units, transmission lines and reactive compensation.…”
Section: B Advantage Of Co-optimization Planning Approachmentioning
confidence: 99%
See 2 more Smart Citations
“…At present, many literatures research on PV and WT generation uncertainty. The weather forecast is used as the method to analyze the power generation uncertainty of PV and WT [12] [28]. With a large number of EVs( such as EV fleets) connected to microgrid for charging, more literatures have been focused on the random characteristics caused by the uncertainty of EV's plug-in time and initial SOC which are the issues affect players' roles in the twolevel Stackelberg game model.…”
Section: Introductionmentioning
confidence: 99%