2018
DOI: 10.1155/2018/6157192
|View full text |Cite
|
Sign up to set email alerts
|

Robust Train Scheduling Problem with Optimized Maintenance Planning on High-Speed Railway Corridors: The China Case

Abstract: Simultaneously considering train scheduling problem and maintenance planning problem with uncertain travel time, we propose a two-stage integrated optimization model for the sunset-departure and sunrise-arrival trains (SDSA-trains). Specifically, in the first stage, we obtain an optimal solution of the SDSA-trains under each scenario, which leads to the minimum total travel time. In the second stage, a robust SDSA-train schedule is generated based on the optimal solutions of the first stage. The key is that we… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
4
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
6
2
1
1

Relationship

0
10

Authors

Journals

citations
Cited by 12 publications
(6 citation statements)
references
References 27 publications
0
4
0
Order By: Relevance
“…It focuses on the maintenance planning problem and summarizes the related research publications. Recently, paper [5] proposed an integrated optimization model for simultaneous consideration of train scheduling problem and maintenance planning problem with uncertain travel time. Another survey in [6] presents a comprehensive review of the existing fault detection techniques for railway switch and crossing systems.…”
Section: Related Workmentioning
confidence: 99%
“…It focuses on the maintenance planning problem and summarizes the related research publications. Recently, paper [5] proposed an integrated optimization model for simultaneous consideration of train scheduling problem and maintenance planning problem with uncertain travel time. Another survey in [6] presents a comprehensive review of the existing fault detection techniques for railway switch and crossing systems.…”
Section: Related Workmentioning
confidence: 99%
“…With increasing traffic and growing demands on the infrastructure, reliability and safety of S&C must be ensured. Large demands on maintenance occur especially on high-speed tracks [2]. Generally, three different maintenance approaches can be applied-corrective, preventive, and predictive [3].…”
Section: Introductionmentioning
confidence: 99%
“…TREP is associated with train scheduling, but obviously different. Train scheduling focuses on train preplanning with the purpose to generate an original train timetable, during which some objectives are primarily considered, such as the number of running trains [8], passenger traveling time [9], energy consumption [10], and even the flexibility of train timetable [11,12]. However, TREP is the train real-time control, during which recovering train order and guaranteeing train punctuality within limited operating time are the primary goals [13,14].…”
Section: Introductionmentioning
confidence: 99%