2018
DOI: 10.1016/j.solener.2018.09.074
|View full text |Cite
|
Sign up to set email alerts
|

Robust performance of photovoltaic/wind/grid based large electricity consumer

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
4
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 10 publications
(4 citation statements)
references
References 83 publications
0
4
0
Order By: Relevance
“…Moreover, the maximum amount of buying/selling energy from/to the main grid is limited to 20 MW in each time horizon. [45], and (c) Load (MW) curve [45] for the next day.…”
Section: Basic Datamentioning
confidence: 99%
See 1 more Smart Citation
“…Moreover, the maximum amount of buying/selling energy from/to the main grid is limited to 20 MW in each time horizon. [45], and (c) Load (MW) curve [45] for the next day.…”
Section: Basic Datamentioning
confidence: 99%
“…Figure 4. (a) Wind speed (m/s)[44], (b) Solar irradiance (W/m 2 )[45], and (c) Load (MW) curve[45] for the next day.…”
mentioning
confidence: 99%
“…Year Stochastic Robust Chanceconstrained [29] 2018 * [30] 2019 * [31] 2020 * [32] 2020 * [16] 2019 * [33] 2019 * [34] 2018 IGDT [20] 2020 * * [35] 2018 * [36] 2020 Riskconstrained [37] 2019 * [38] 2019 Riskconstrained [39] 2019 CVaR-Constrained [40] 2020 IGDT [41] 2020 * [42] 2020 Risk…”
Section: Refmentioning
confidence: 99%
“…The focus is on the optimal energy portfolio of the customer and not on the configuration of the PPA, e.g. [2][3][4]. This paper focuses on the PPA and especially on the operation of the storage coupled with the renewable generation.…”
Section: Introductionmentioning
confidence: 99%