2022
DOI: 10.2139/ssrn.4261723
|View full text |Cite
|
Sign up to set email alerts
|

Robust Bidding Strategy for Multi-Energy Virtual Power Plant in Peak-Regulation Ancillary Service Market Considering Uncertainties

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(3 citation statements)
references
References 0 publications
0
3
0
Order By: Relevance
“…At this stage, the diversification of RES and other technologies, such as electricity storage, should be considered, but there must be an economic viability to the project. It is proposed that RES installations scattered over many buildings will operate in a coordinated manner, forming a virtual power plant-VPP [56]. The penultimate stage in the development of distributed generation technologies on university campuses is investment in energy independence-Stage 3.…”
Section: The Pyramid Of Energy Goalsmentioning
confidence: 99%
“…At this stage, the diversification of RES and other technologies, such as electricity storage, should be considered, but there must be an economic viability to the project. It is proposed that RES installations scattered over many buildings will operate in a coordinated manner, forming a virtual power plant-VPP [56]. The penultimate stage in the development of distributed generation technologies on university campuses is investment in energy independence-Stage 3.…”
Section: The Pyramid Of Energy Goalsmentioning
confidence: 99%
“…The construction of a new power system mainly based on new energy means that wind power and photovoltaic will be the main body of the future power system, and coal power will be relegated to auxiliary energy [2][3]. The system consumption capacity is a necessary condition for the development of new energy, so it is essential to strengthen the construction of a system flexible regulation power supply and vigorously improve the power demand side response capacity [4][5]. Since 2017, China's electricity spot market, represented by Shandong, Zhejiang, Guangdong, and other places, has completed its initial construction and has gradually improved the trading environment of the power market, relaxed the access conditions of the power market, increased the types of power market subjects, stimulated the vitality of the power market, and guided the power market to play a market-led role [6][7][8][9].…”
Section: Introductionmentioning
confidence: 99%
“…As an independent market entity, VPP aggregates distributed energy resources to participate in the electricity market in the form of price takers, which can transact electricity, to maximise profits [10,11] and formulate bidding strategies according to each member. According to the mechanism in North China, the bidding model for VPP to participate in the peak shaving market is determined, and the benefits are distributed among members through Shapely [12]. By participating in peak shaving for interruptible loads and energy storage, a peak shaving bidding model aiming at the lowest cost of VPP peak shaving was established [13].…”
Section: Introductionmentioning
confidence: 99%