2020
DOI: 10.1016/j.ejor.2019.07.023
|View full text |Cite
|
Sign up to set email alerts
|

RobinX: A three-field classification and unified data format for round-robin sports timetabling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
22
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
5
3
1

Relationship

5
4

Authors

Journals

citations
Cited by 52 publications
(32 citation statements)
references
References 75 publications
0
22
0
Order By: Relevance
“…Despite numerous contributions on sport scheduling (see e.g. [10], [15], [16], [19], and [21]), as far as we are aware, the issue of uncertainty (or dealing with it) has not been studied before. However, successful applications of proactive and/or reactive optimization can be found in various domains such as project scheduling [12,20], berth and quay crane scheduling [8], job shop scheduling [17], inventory systems [18], etc.…”
Section: Introductionmentioning
confidence: 99%
“…Despite numerous contributions on sport scheduling (see e.g. [10], [15], [16], [19], and [21]), as far as we are aware, the issue of uncertainty (or dealing with it) has not been studied before. However, successful applications of proactive and/or reactive optimization can be found in various domains such as project scheduling [12,20], berth and quay crane scheduling [8], job shop scheduling [17], inventory systems [18], etc.…”
Section: Introductionmentioning
confidence: 99%
“…This section briefly outlines the three-field notation ( α /β/γ ), as proposed by Van Bulck et al (2020), to describe different variants of the sports-timetabling problem.…”
Section: A Three-field Notation For Sports Timetablingmentioning
confidence: 99%
“…This format, however, has limited utility with respect to the ease of data manipulation and is not extensible towards several real-world problems. Recently, Van Bulck et al (2020) proposed a more advanced XML-supported three-field notation, coined RobinX, to describe and exchange sports timetabling instances and solutions. RobinX can store nearly every constraint found in the literature and is complemented with a C++-library to read, write and evaluate these XML files.…”
Section: Introductionmentioning
confidence: 99%
“…Deciding upon the matches to be played in each round of a single or double round robin tournament is known to be of great practical importance in scheduling professional leagues such as soccer competitions. Indeed, scheduling a round robin tournament has attracted a lot of attention in the scientific literature [9,16]; a popular approach to do so is known as a first-break, then-schedule approach [14]. The relevance of the first-break, then-schedule approach is strengthened by the observation that, when scheduling multiple leagues consecutively, first-break then-schedule is able to take capacity considerations of clubs that have teams playing in different leagues, into account [2].…”
Section: Introductionmentioning
confidence: 99%